FRACDOCK™ INTERVENTION-FREE FRAC PLUG SYSTEM

ISOLATE STAGES, NO PLUG-REMOVAL REQUIRED

With groundbreaking technology available exclusively to Nine Energy Service customers, the patented FracDock Intervention-free Frac System replaces composite bridge plugs in plug and perf operations. The result? Reduced completion times, lower costs and mitigated safety risks.

BIG ENOUGH FOR RE-ENTERING THE WELL BORE

The FracDock intervention-free frac plug system is designed to minimize subsequent coiled tubing well intervention procedures. This unique technology eliminates the need to drill out plugs and allows for limited risk of premature plug setting. As the largest ID frac plug on the market, the FracDock allows operators to re-enter the well bore, if needed, with coiled tubing or production tubing.

COMPLETE MORE COMPLETIONS

Innovative FracDock technology, combined with Nine’s well completion expertise and service, enables operators to reduce completion times and transition the well to production more quickly.

SYSTEM ADVANTAGES

  • Designed to eliminate subsequent coiled tubing well intervention and plug drill outs
  • Limited risk of premature plug setting
  • Largest ID frac plug on the market
  • Lowest-cost solution available to the operator
  • Can run 2 ⅞” tubing , and re-enter the wellbore if needed
SIZES OUTSIDE DIAMETER INSIDE DIAMETER UNCOMPRESSED LENGTH SET LENGTH DIFFERENTIAL PRESSURE RATING BALL DIAMETER
5.5” 17 lb/ft 4.38” 3.77” 15.36” 9.85” 6500 psi 4.25”
5.5” 20 lb/ft 4.50” 3.90” 15.36” 9.85” 6500 psi 4.25”
5.5” 23 lb/ft 4.63” 4.02” 15.36” 9.85” 7000 psi 4.375”
4.5” 15.1 lb/ft 3.50” 2.90” 15.36” 9.85” TBD 3.375”
4.5” 13.5 lb/ft 3.63” 3.63" 15.36” 9.85” TBD 3.375”
4.5” 11.6 lb/ft 3.75” 3.15” 15.36” 9.85” TBD 3.375”

SAVE TIME AND COSTS

The FracDock offers technology unlike anything else available on the market today, helping operators increase productivity and reduce costs. Contact your local sales representative for pricing.