NINE PUTS THE 'UP' IN UPTIME

Nine Energy Service’s coiled tubing teams are as fast as they come. Which means you’re not waiting around for your well to become productive and profitable.

We have the equipment and expertise to service the longest and most complex horizontal wells—at any stage. Our ability to do the job quickly, accurately and safely is appreciated by our customers. And, they like that we are quick on our feet. We know how to solve problems, even when those problems are outside of our job scope.

Our solutions are tailored to your needs. We’re not in the business of selling chemicals or milling bottom hole assemblies, so you can rest assured that any of the providers we recommend are the most appropriate for your project.

Ultimately, our speed is a result of doing things the right way, ensuring safety and compliance every step of the way.

Coiled Tubing Services & Solutions

Our coiled tubing units range from 1¼ to 2 5/8 inches in diameter. With large capacity units, we can run up to 28,000 feet of 2 3/8 inch coiled tubing. Nine also offers a complete line of support services:

  • Frac plug millout
  • Wellbore cleanout
  • Fluid pumping
  • Nitrogen pumping and bulk nitrogen delivery/sales
  • Tubing-conveyed perforating (jet or abrasive)
  • Fishing/milling
  • Stimulation via coiled tubing
  • Crane services
  • Pre-job engineering, planning, and design with industry-leading software

How well do you know your well?

Informed decisions are profitable decisions. AllSight delivers the real-time project details you need to succeed.

Additional Coiled Tubing Resources

Explore Nine's full range of coiled tubing services, solutions and informational resources in detail.

Brochure: Coiled Tubing Services & Solutions

Learn more about the expertise and tools that handle the industry’s most challenging and complex coiled tubing projects.

White paper: Plug Mill-out Operational Challenges

Get an in-depth look at overcoming +13,000-foot laterals with 2.375-inch coiled tubing.

Case Study: Coiled Tubing Fishing Technique

See how an operator in Haynesville saved more than 55 days and $4 million with unique high pressure coiled tubing fishing technique.

Frequently Asked Questions

When you live on the cutting edge, you field a lot of questions. If you don’t find the answers you need here, please reach out to us directly.

  • How much time can you save me on coiled tubing operations?

    Time will of course vary by project, but our coiled tubing team frequently finishes as much as a day-and-a-half sooner than most of our competitors. That can translate to more than $80,000 saved by getting the job done faster.

  • What is the longest coiled tubing string you’ve run?

    We have successfully run the longest 2 5/8-inch Coiled tubing string on record in North America—25,595 feet with a 2 5/8-inch unit in the Permian Basin. The lateral section of that well was more than 12,500 feet.

  • What is the deepest well you’ve run?

    We ran to a total depth of 25,439 feet on a well in Enid, Oklahoma using 2 3/8" coiled tubing.

  • Do you offer both small- and large-diameter coiled tubing units?

    In accordance with industry demand, the majority of our units are large-diameter, but our sizes range from 1¼ inches to 2 5/8 inches.

Let's Talk Coiled Tubing Services

We've got answers to your uptime questions.