Abstract

Casing integrity failure, whether through parted casing, leaky collars or some other issue, may result in less effective stimulation work due to abandonment of the plug and perf method and/or having to complete through a frac liner. In more extreme cases it could result in lost reserves below the casing failure point. Modern technology has provided a cost effective solution to this problem.

In this case, the operator confirmed parted 4-1/2 inch production casing at 9,761 feet (Fig. 1a) in their northern
Piceance Basin acreage. The operator would have to repair the parted casing in order to frac the lower six zones of the well. The plug & perf method for zonal isolation was required to effectively complete the 2,825 foot vertical pay interval. In order to complete the stimulation program, the goal was to repair the short section of damaged casing and restore pressure integrity to the well while maintaining a sufficient inner diameter (ID) to allow composite frac plugs to pass through the repair and set in the base casing’s larger ID below the split. The solution was the use of custom made composite frac plugs in conjunction with a 3-1/2 inch single-joint solid expandable system that was expanded downhole to cover and seal the parted 4-1/2 inch casing.

The 30-ft., 3-1/2 inch solid expandable high-pressure, high-temperature (HPHT) liner system was deployed and
expanded in a single trip. This system provided the required pressure integrity to withstand the frac pressures needed in this area. The 3.261 inch drift ID of the expanded solid liner allowed the operator to run custom 3.06 inch outer diameter (OD)composite frac plugs below the repaired section and successfully complete the well.

This installation was a success, as the operator had essentially written off 63% of the well’s reserves due to the
casing part occurring above a majority of the pay interval. The operator is now realizing full production from the entire well. Moreover, this single-joint solid expandable liner technology coupled with the special drillable composite frac plugs can be used in any HPHT formation to repair the common issue of damaged casing to allow plug and perf completions to continue.

To read the full paper please visit: https://www.onepetro.org/conference-paper/SPE-159751-MS


Copyright 2012, Society of Petroleum Engineers
This paper was prepared for presentation at the SPE Annual Technical Conference and Exhibition held in San Antonio, Texas, USA, 8-10 October 2012. This paper was selected for presentation by an SPE program committee following review of information contained in an abstract submitted by the author(s). Contents of the paper have not been reviewed by the Society of Petroleum Engineers and are subject to correction by the author(s). The material does not necessarily reflect any position of the Society of Petroleum Engineers, its officers, or members. Electronic reproduction, distribution, or storage of any part of this paper without the written consent of the Society of Petroleum Engineers is prohibited. Permission to reproduce in print is restricted to an abstract of not more than 300 words; illustrations may not be copied. The abstract must contain conspicuous acknowledgment of SPE copyright.